EBS Stockpile Treatment Proves Long-Term Dust Control & Erosion Prevention at ASSMANG Khumani Iron Ore Mine

At ASSMANG Khumani Iron Ore Mine, a stockpile treatment using EBS Soil Stabilizer was conducted to demonstrate its effectiveness in dust control and erosion prevention. Two adjacent stockpiles were monitored:

✅ One treated with EBS Surface Seal
❌ One left untreated

Remarkable Results Over Time

📉 Material Loss Comparison – After three months, the untreated stockpile lost 169 tonnes of material, while the EBS-treated stockpile had zero measurable loss.
🌱 Natural Re-Vegetation – The treated stockpile not only remained stabilized but also supported vegetation growth.
🌬 Independent Monitoring & Long-Term Performance – A three-year monitoring report documented weather and wind conditions, proving EBS withstood environmental challenges.
⏳ Unmatched Longevity – Despite recommended maintenance applications every 18 months, the treated stockpile has remained intact and stable for 12 years, without any additional maintenance.

Why EBS for Stockpile Management?

✔ Eliminates material loss due to wind and rain erosion.
✔ Provides long-term dust suppression with no reapplication needed for years.
✔ Reduces environmental impact by preventing sediment runoff.
✔ Supports re-vegetation, aiding in mine rehabilitation efforts.

📩 Full details of the independent monitoring report are available below. Contact us today to see how EBS can transform stockpile management at your site!